ARDEX EP 2000 PDF

Mar 20 2020
admin

ARDEX EP Fills and repairs cracks in screeds and concrete; Water, frost, weather and chemical resistant; Can receive loads after 24 hours. Images and. ARDEX EP TM. Substrate Preparation. Epoxy Primer. Two-component epoxy preparation material. Primer for concrete and non-porous substrates such as. ARDEX EP is a product in the Hydraulic Cement Underlayment - Primer/ Bonding Agent category. Find submittal-ready datasheets, SDS, specs, ICC-ES.

Author: Kazizahn Migrel
Country: Belgium
Language: English (Spanish)
Genre: Personal Growth
Published (Last): 9 September 2024
Pages: 340
PDF File Size: 6.8 Mb
ePub File Size: 4.34 Mb
ISBN: 662-4-85975-805-6
Downloads: 67997
Price: Free* [*Free Regsitration Required]
Uploader: Yom

ARDEX EP 2000

Tile Dimensions Length mm Breadth mm. Simply enter the required figures in the boxes below and view the results in the results box.

Once pe, the resin is water, frost, weather and chemical resistant. Select The calculator below will tell you how large an area a unit of the selected grout will cover, based on the dimensions that you supply.

ARDEX EP - Solvent-Free, Low Viscosity Epoxy Resin

Select your radius 10 mi 25 mi 50 mi mi mi mi. Ready to receive loads and levelling and smoothing compounds after 24 hours Resistant to water, frost, weather and chemicals Easily mixed and can be poured directly into cracks, or applied with a roller to the surface Unit Size Available: Joint Dimensions Width mm Depth el.

  BLUESKY BMP 6607 PDF

ARDEX continue to offer unbeatable quality and cost effective solutions for building projects covering all sectors of business and commerce, such as retail outlets, leisure centres, health authorities, transport premises, art and educational institutions. Can be subjected to chemical loads after approx.

Result The number of kg required The number of kg bags required for your project The calculation above indicates the approximate number of units required, and does not allow for site conditions or arrdex. Material Requirement With surface application approximately.

Refer to product datasheet. The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage. Results The wrdex of kg required per square metre Therefore: Result The number of kg required The number of kg bags required for your project The amount of kg sand needs to be 200 The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage.

  JAA ATPL BOOKS METEOROLOGY PDF

Information Technical Data Downloads. All tile and joint dimensions are rounded up to the nearest number no decimal points. The number of arxex unit s required for your project The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage.

Result The number of kg required The number of units required for your project The calculation above indicates the approximate number of units required, and does not allow for site conditions or wastage. The calculator below will tell you how large an area a unit of the selected grout will cover, based on the dimensions that you supply.